Plan-Do-Check-Act (PDCA)
Apply PDCA cycle for continuous improvement through iterative problem-solving and process optimization.
Description
Four-phase iterative cycle: Plan (identify and analyze), Do (implement changes), Check (measure results), Act (standardize or adjust). Enables systematic experimentation and improvement.
Usage
/plan-do-check-act [improvement_goal]
Variables
- GOAL: Improvement target or problem to address (default: prompt for input)
- CYCLE_NUMBER: Which PDCA iteration (default: 1)
Steps
Phase 1: PLAN
- Define the problem or improvement goal
- Analyze current state (baseline metrics)
- Identify root causes (use
/whyor/cause-and-effect) - Develop hypothesis: "If we change X, Y will improve"
- Design experiment: what to change, how to measure success
- Set success criteria (measurable targets)
Phase 2: DO
- Implement the planned change (small scale first)
- Document what was actually done
- Record any deviations from plan
- Collect data throughout implementation
- Note unexpected observations
Phase 3: CHECK
- Measure results against success criteria
- Compare to baseline (before vs. after)
- Analyze data: did hypothesis hold?
- Identify what worked and what didn't
- Document learnings and insights
Phase 4: ACT
- If successful: Standardize the change
- Update documentation
- Train team
- Create checklist/automation
- Monitor for regression
- If unsuccessful: Learn and adjust
- Understand why it failed
- Refine hypothesis
- Start new PDCA cycle with adjusted plan
- If partially successful:
- Standardize what worked
- Plan next cycle for remaining issues
Examples
Example 1: Reducing Build Time
CYCLE 1
───────
PLAN:
Problem: Docker build takes 45 minutes
Current State: Full rebuild every time, no layer caching
Root Cause: Package manager cache not preserved between builds
Hypothesis: Caching dependencies will reduce build to <10 minutes
Change: Add layer caching for package.json + node_modules
Success Criteria: Build time <10 minutes on unchanged dependencies
DO:
- Restructured Dockerfile: COPY package*.json before src files
- Added .dockerignore for node_modules
- Configured CI cache for Docker layers
- Tested on 3 builds
CHECK:
Results:
- Unchanged dependencies: 8 minutes ✓ (was 45)
- Changed dependencies: 12 minutes (was 45)
- Fresh builds: 45 minutes (same, expected)
Analysis: 82% reduction on cached builds, hypothesis confirmed
ACT:
Standardize:
✓ Merged Dockerfile changes
✓ Updated CI pipeline config
✓ Documented in README
✓ Added build time monitoring
New Problem: 12 minutes still slow when deps change
→ Start CYCLE 2
CYCLE 2
───────
PLAN:
Problem: Build still 12 min when dependencies change
Current State: npm install rebuilds all packages
Root Cause: Some packages compile from source
Hypothesis: Pre-built binaries will reduce to <5 minutes
Change: Use npm ci instead of install, configure binary mirrors
Success Criteria: Build <5 minutes on dependency changes
DO:
- Changed to npm ci (uses package-lock.json)
- Added .npmrc with binary mirror configs
- Tested across 5 dependency updates
CHECK:
Results:
- Dependency changes: 4.5 minutes ✓ (was 12)
- Compilation errors reduced to 0 (was 3)
Analysis: npm ci faster + more reliable, hypothesis confirmed
ACT:
Show the whole skill (131 more lines)
Standardize: ✓ Use npm ci everywhere (local + CI) ✓ Committed .npmrc ✓ Updated developer onboarding docs
Total improvement: 45min → 4.5min (90% reduction) ✓ PDCA complete, monitor for 2 weeks
### Example 2: Reducing Production Bugs
CYCLE 1 ─────── PLAN: Problem: 8 production bugs per month Current State: Manual testing only, no automated tests Root Cause: Regressions not caught before release Hypothesis: Adding integration tests will reduce bugs by 50% Change: Implement integration test suite for critical paths Success Criteria: <4 bugs per month after 1 month
DO: Week 1-2: Wrote integration tests for: - User authentication flow - Payment processing - Data export Week 3: Set up CI to run tests Week 4: Team training on test writing Coverage: 3 critical paths (was 0)
CHECK: Results after 1 month: - Production bugs: 6 (was 8) - Bugs caught in CI: 4 - Test failures (false positives): 2 Analysis: 25% reduction, not 50% target Insight: Bugs are in areas without tests yet
ACT: Partially successful: ✓ Keep existing tests (prevented 4 bugs) ✓ Fix flaky tests
Adjust for CYCLE 2: - Expand test coverage to all user flows - Add tests for bug-prone areas → Start CYCLE 2
CYCLE 2 ─────── PLAN: Problem: Still 6 bugs/month, need <4 Current State: 3 critical paths tested, 12 paths total Root Cause: UI interaction bugs not covered by integration tests Hypothesis: E2E tests for all user flows will reach <4 bugs Change: Add E2E tests for remaining 9 flows Success Criteria: <4 bugs per month, 80% coverage
DO: Week 1-3: Added E2E tests for all user flows Week 4: Set up visual regression testing Coverage: 12/12 user flows (was 3/12)
CHECK: Results after 1 month: - Production bugs: 3 ✓ (was 6) - Bugs caught in CI: 8 (was 4) - Test maintenance time: 3 hours/week Analysis: Target achieved! 62% reduction from baseline
ACT: Standardize: ✓ Made tests required for all PRs ✓ Added test checklist to PR template ✓ Scheduled weekly test review ✓ Created runbook for test maintenance
Monitor: Track bug rate and test effectiveness monthly ✓ PDCA complete
### Example 3: Improving Code Review Speed
PLAN: Problem: PRs take 3 days average to merge Current State: Manual review, no automation Root Cause: Reviewers wait to see if CI passes before reviewing Hypothesis: Auto-review + faster CI will reduce to <1 day Change: Add automated checks + split long CI jobs Success Criteria: Average time to merge <1 day (8 hours)
DO:
- Set up automated linter checks (fail fast)
- Split test suite into parallel jobs
- Added PR template with self-review checklist
- CI time: 45min → 15min
- Tracked PR merge time for 2 weeks
CHECK: Results: - Average time to merge: 1.5 days (was 3) - Time waiting for CI: 15min (was 45min) - Time waiting for review: 1.3 days (was 2+ days) Analysis: CI faster, but review still bottleneck
ACT: Partially successful: ✓ Keep fast CI improvements
Insight: Real bottleneck is reviewer availability, not CI Adjust for new PDCA: - Focus on reviewer availability/notification - Consider rotating review assignments → Start new PDCA cycle with different hypothesis
## Notes
- Start with small, measurable changes (not big overhauls)
- PDCA is iterative—multiple cycles normal
- Failed experiments are learning opportunities
- Document everything: easier to see patterns across cycles
- Success criteria must be measurable (not subjective)
- Phase 4 "Act" determines next cycle or completion
- If stuck after 3 cycles, revisit root cause analysis
- PDCA works for technical and process improvements
- Use `/analyse-problem` (A3) for comprehensive documentation