Skip to content

pr-feedback-quality-gate

Safely track pull request feedback, resolve review comments or merge conflicts, validate fixes, and use a read-only cross-review before committing or pushing follow-up changes.

1,772
installs
0 up / 0 down, score 0.00
votes
103,262
repo stars
Updated
less than a month ago
In the catalog since
1 Oct 2026
From
nexu-io/open-design
Get it through your agent npx skills add nexu-io/open-design@pr-feedback-quality-gate

Skill instructions

Rendered from the published SKILL.md, 39 lines.

PR Feedback Quality Gate

Use this when a PR has review feedback, merge conflicts, pending checks, or needs a monitored follow-up after a fix.

Workflow

  1. Inspect PR state first: comments, reviews, mergeability, checks, branch, and local worktree status. Keep unrelated local changes out of the PR.
  2. Use an isolated worktree for review fixes or conflict resolution when the main checkout is dirty, behind remote, or being used by another agent.
  3. Make the smallest safe fix. Preserve the original bug invariant and any newer upstream structure introduced by main.
  4. Run the narrow validation first, then the repository-required gates. For this repo, include pnpm guard; add package typechecks/builds/tests when touched files require them.
  5. Before commit or push, run a read-only cross-review of the staged or proposed diff. Forbid file edits and git write or coordination commands.
  6. Treat cross-review as evidence, not authority. Accept only findings grounded in the diff, repository rules, user goal, or validation results. Downgrade or reject style preferences, broad scope expansion, and suggestions that conflict with safety or ownership boundaries; record the reason briefly.
  7. If accepted blockers remain, fix them, rerun validation, and repeat the review. Commit and push only after validation passes and there are no accepted blockers.

Monitoring cadence

  • Active review or failing checks: check often enough to unblock quickly.
  • Clean or approved PR waiting for merge: check about every 12 hours.
  • Merged PR: reduce to daily lightweight observation for CI, release, or regression signals, and stop making code changes unless asked.

Report

Always report PR state, actions taken, cross-review verdict, accepted or rejected findings, validation run, commits pushed, skipped checks with reasons, remaining risks, and next step.